Let our team of experienced sales engineers assist you in the design of your project pre-construction. When cables are needed our expert technicians will build and test each UL Listed power cables to the highest quality for on time delivery to your new site.
- Capacity to build 200+ Power Whips Per Day to keep your project on schedule
- One Fixed Cost , Project Cost Reduction : eliminating multiple component purchasing, labor, warehouse and inventory cost
- As opposed to building mission critical cables on the jobsite, All DCN Cables are built in our facility in Wake Forest, NC in a Clean, Controlled, UL Certified Environment where all we do is build Power Cables for the data center environment.
- Blue Print/Panel Schedule Take Off’s at no charge
- Cables shipped in Sturdy Fiber Drums, content labeled, barreled by PDU/RPP for faster onsite installation
- Experience from hundreds of new data center builds from planning, execution to delivery
- Post construction, DCN Cables can continue the standards and procedures that were set in place and insure they are maintained when additional circuits are needed
|
|
|
Have a specific way that you would like you cables labeled, mounted or built, DCN Cables is glad to build to your specific needed, and have them on site ASAP. The best marketing arm that we have is the clients we serve; they have touted our services through press releases and national vendor of the year awards. We partner with our clients to ensure that they will have only the best for their data center, timely and with cost savings.
Individual Site Standards and Configurations maintained by DCN Cables
- No Minimum Orders
- Most orders go out within 24 hours
- Expertise and knowledge transfer to clients on every power configurations they encounter
- Save 10 – 50% based on your current power cabling methods
- Use of the DCN Cable Builder for clients to compile their project needs
- Huge Inventory levels of 8 Colors of Liquid Tight, NEMA Devices, IEC 309 Devices and the full Russell Stoll line
- Breakers can be purchased with Cable Projects and shipped together
- One Day Ship Points to the majority of the East Coast, 2nd Day to the Midwest and 3rd Day to the West Coast through standard Freight Services, expedited services are available as well.
|
|